Dec 2011 – Imaging Log

Imaging with the Winter/Spring 2012 image on all computers in the following spaces is complete … Exceptions noted with issues listed at the end ….

Labs:

  • Bronfman 119
  • Harper GIS
  • Jesup B03
  • Jesup 101
  • Jesup 204
  • Jesup 207
  • Jesup 316a
  • Schow GIS

Lecterns:
(Individual computers in parenthesis need to be checked and/or imaged – see complete list of computers with issues below.)

  • Bernhard
  • Bronfman
  • Clark (Clk-105-pc not set to boot to network)
  • Griffin (gfn-002-mac needs to be checked)
  • Greylock (Greylock D – mac and pc are unresponsive and are likely “broken”)
  • Hollander (nab-040-pc not set to boot to network)
  • Hopkins (names change)
  • Jesup (jsp-205-pc to be replaced with dual-boot, jsp-206-pc not set to boot to network)
  • Lawrence
  • Paresky
  • Schapiro (sab-137-pc not set to boot to network)
  • TBL – Biology
  • TCL – Chemistry (tcl-206-pc not set to boot to network first)
  • TPL – Physics
  • Weston

Libraries:

  • Sawyer Classroom (swy-cls-03 not set to boot each morning)
  • Sawyer Lower Level Lab
  • Sawyer Main level (swy-bay-1 and swy-opn-28 need to be checked)
  • Schow Atrium (ssl-atrium-14 and ssl-atrium-24 not set to boot each morning)
  • Schow Classroom

Specific computers with issues:

These are likely unusable:

  • glk-d-mac and glk-d-pc — image process did not complete correctly, reboot to restart imaging process
  • swy-bay-01 and swy-opn-28 — image process did not complete correctly, reboot to restart imaging process

These are likely usable but will need to be checked and imaged in January:

  • clk-105-pc — not set to boot to network first
  • ctd-sem-pc — not on-line
  • gfn-002-mac — not on-line
  • jsp-206-pc — not set to boot to network first
  • nab-040-pc — not set to boot to network first
  • sab-137-pc — not set to boot to network first
  • spn-212-pc — not on-line
  • ssl-atrium-14 and ssl-atrium-24 — not set to boot each morning
  • swy-cls-03 — not set to boot each morning
  • tcl-206-pc — not set to boot to network first

Still to do:

  • CDE Lectern and lab – not till after winter study
  • Clark lab
  • ’62 CTD lectern and lab
  • Jesup 205 – not till January, photography image
  • Jesup 316 (3 of 7 still need to do)
  • Spencer lectern and labs
  • Physics lab (not till January)
This entry was posted in Labs and tagged , . Bookmark the permalink.

Comments are closed.